So drywall finishing isn't very exciting, thus my lacking of any recent posts...Here are the updates...
When I stopped by Saturday and there was one guy at the house cleaning up all the sanding dust.  I bet there was an inch of dust he had swept between the front door and the stairs.  I did not go upstairs, as the guy was right there cleaning when I stopped.  

Current front view.  Siding appears to be all done.  Just need paint on the trim, a porch floor and stonework.


Kitchen wall that appears all ready for paint.


Great room


This is the "closet" under the basement stairs.  They finally put the drywall up.  Sometimes I wonder what would have happened if I didn't say anything.  They left it until I emailed them.


This is the basement rec. room area.  Notice the joint compound is not dry yet.  This was done on Monday 9-16-2013.


Basement closet area with fresh mud.


This is the spot right under the stairs.  I would have been OK with a 2' wall there, but they went right to the floor.  Those will be some fun angles to cut and finish with trim.


And in the garage is 35 gallons of white paint!! I am assuming that is the next step.  Both upstairs and the main floor are ready.  Basement would probably be ready tomorrow if they get it sanded.