So I haven't been able to get to this lately, but here are the updates.  Siding was delivered last Thursday (8-22).  Almost all, if not all, the electrical is done.  Yesterday (8-26) they started doing siding.  Today they delivered drywall.  However, they have not insulated yet.  There was no progress with siding today, not sure if it was due to the high temps and humidity or what.  I know I was drenched with sweat just taking these pictures!

Here is a pic of the siding in the garage as it was last Thursday.


This was taken Monday 8-26.


Here is the pile of material in the garage today.  We even have the porch railing.  There is another skid of drywall too.


This is the drywall stored in the great room.


This is from the master bedroom showing all the drywall waiting to be hung.


This is for my reference.  This is where they ran the cable (and cat 5E?) up over the garage ceiling.  This comes out in the wall in the upstairs bathroom.  There is a picture of that area too.  Good part is the cable could easily be tapped into to run to any of the upstairs rooms.  Not sure why there is 5E, but they have it coming from the cable entrance,

 So here is a shot of the wiring coming into the wall in the upstairs bath against the garage wall.

This is our siding info.  Hudson Bay Khaki.

This is the back wall area of the "media closet".  I drilled a small hole through the stud here so I can drill a large hole from the basement after we take possession to run wires.

This is the wall between the media closet and the laundry room. 

This is under the media closet.  This will be in the unfinished mechanical room, so I can easily drill a hole to run wires.  I hope I can find the hole again when the time comes!