This was a complete blind shot, not bad guessing. We have toilet paper holders and switches in place. This is the main floor bathroom.
Thermostat! They also have many of the register grills in. It is NOTICEABLY warmer upstairs. Hope it balances better when it is done. I dampened some of the upstairs grills to see if it helps next time I am there.
Switches in the kitchen. Almost makes one think they don't know what is what.
Basement stairway light.
All switches and wall plates are in place in the basement. This is the bedroom switch.
Bath fan is installed in the basement bath.
Cold air return grills are in, at least some of them.
This is a good shot of the upstairs hall area. Lights, smoke detector, cold air vents and switches are all in.
They are also installing all the brackets for the closet shelves. This is the master closet wall. Looks like they goofed.
We now have a mirror in the master bath. The bathtub area is also being prepped.