They have tiled the back splash around the kitchen counter. It really looks good! This is the range hood that was laying there. It was Saturday when we stopped, and they were actively working.
Not sure when, but they now have the water heater in place
Sunday when we stopped, we noticed hey have the real doors in place. Not sure we like the color on the front door, may paint it a red to go with the stone. Now they have all the real locks in place, so out key no longer works. We stopped at Allen Edwin and thought we could get a new key. They did not want us to have a key, so looks like for the next few weeks, we either have to call them, or try to get there during working hours. They also have the exterior lights up.
We had the blind guy come to measure blinds Saturday. He noticed the basement windows were not trimmed out the same as all the rest. They did not run the trim to the frame, it is about an inch short. I hope they can do something, as that will be a dirt catcher.
All the lights are installed. Everything appears to work (electric wise). They still need to finish the furnace and get the water hooked up. Stove needs hooked up and all the closet shelves are wrong (we paid for freeslide and that is not what is installed). We emailed Larry several questions/issues to make him aware of. We should have carpet by the end of the week.
I forgot Barb took some pics today too!
The front lights by the garage.
Outlet by front door.
Microwave and oven.
Stove area. This is not in place yet, I was able to just pick up the stove. I think they have to fix the drawer so it is non-functional before they tie it all down.
I think we still have a hood to get installed here.
This is a good shot of the outer counter area. We are not sure if the outer cabinets get doors or not. That was one of the questions for Larry.
Here is the kitchen island area, with pendant lights!
Dining room light.
Furnace and hot water heater area.