Thursday, October 31, 2013

Thursday's work, final mechanical done

I had to get Tom to let me in, things are locked down now.

So they did get the AC unit installed today

We have final mechanical signed off.  Hopefully they get the rest done soon.  Probably need to get the hole fixed above the box in the basement before the electrical and building can be signed off.


Although not thoroughly cleaned, here is a shot of the kitchen area.  There is still a lot of dust on the floor.  Hope they get the dust out of all the cracks and crevices.

Dining room

Humidifier was installed today.  Required with hardwood to maintain moisture.

What is left is finishing of the drywall joints and all the other areas they need to finish better.  The tile around the master bathtub needs finished and all tile needs grout.  We also need grass.  Too bad they did not get that in before all this rain!!