So these are the little stones that are in place under the ledge. I hope they do something else.
We have a dishwasher and kitchen faucet.
They have installed the can lights and prepped for the pendant lights over the island.
They even have our mailbox in the garage!
Here is the prep for the air conditioner. They also ran the sprinkler main line.
Air conditioner is in the garage.
Downstairs bathroom mirror is in. This was the first area I noticed had electricity hooked up! We have lights!
I think almost everything is in this bath, except toilet paper, LOL.
They installed the water meter. If you look on the floor, you can see that it is leaking. I have emailed Larry about this. I may get a bucket for it.
Electric panel with breakers installed.
The girls bathroom looks complete
So they have this one piece installed. But I noticed it is not free slide, which we paid for. I have emailed Larry.
The nice elongated toilet for the "throne room".
Here is the 1/2 bath on the main floor. This did not have power.
Tomorrow (10-26-13), we meet the blind guy to measure for blinds. We have moved up the refrigerator, and our furniture is in. Let's get this place finished already!
No comments:
Post a Comment