We now have gutters and crown molding is going up.  The sink tops are in place in both upstairs bathrooms.

 So they have painted the all the outside trim, and put up gutters and downspouts.




You can sort of see, but they also have the gas line ran.  Furnace is running in the house.  It certainly isn't balanced well, so I hope it gets better.

Crown molding in the den.  Also all the window trim is in place.

 The only widow trim that is not in is the high window over the entrance way.


Guys were working on the crown molding when we stopped.


This is the dual sink in the girl's bathroom.


The window trim in the master bedroom.

 Here is the vanity in the master bath.  Note the wall that got a little "persuasion" when they were installing.  That will need fixed.  I also notice there is a considerable gap at the back in the middle.  Oh, look at the ham in the middle!